US Army Corp of Engineers Construction Schedule Assistance
Schedule Creation and Maintenance (USACE Compliant with SDEF file creation)
Cost and Manpower Loading
Delay, Impact, and Claims Preparation and Analysis
Training
SIS has experience providing schedules that meet the US Army Corp of Engineers specifications.
Their specs often call for the following:
Cost loading
Narrative Reports
S-Curves
Milestones
Schedule includes activities with appropriate Level of Detail
Reasonable Activity Durations
Design, Procurement, and Permit Activities Included
Critical Path Method (CPM) of network calculations
Precedence Diagram Method (PDM) schedules
Activity Coding including:
Responsibility (RESP)
Area
Contract Line Item (CLIN)
Phase of Work (PHAS)
Category of Work (CATW)
Features of Work (FOW1)
Appropriate use of Constraints
Schedule prepared with two open ends: Start Project or NTP with no predecessor logic and End Project with no successor logic.
Representation at periodic schedule update meetings
Basis for progress payments
Contract Changes / Requests for Equitable Adjustment (REA) Coding
Monthly submission of reports and schedule
Recovery schedules if needed from impacts
Qualified scheduling personnel
Integration of Primavera's P3 or P6 scheduling software and US Army Corp of Engineers QCS Software
Resident Management System (RMS),
Quality Control Software (QCS), and
Standard Exchange Data Format (SDEF)
The Quality Control System (QCS) is the Contractor’s quality management and contract administration module of the Government’s Resident Management System (RMS) and was developed to assist contractors in providing contract-required data to the Corps of Engineers. Primavera software currently is the preferred CPM software. The SDEF Conversion utility facilitates the exchange of information between the scheduling software and the contractors QCS software. That information is then uploaded to the government's RMS system. SIS can create the SDEF file that is uploaded into QCS.